Basement Progress

So because getting the basement is such a huge deal for me I thought I'd write a little post on how it's going. Everything is pretty much on schedule to be finished next week so I'm ecstatic.

Basement compounded and drying.
What Has Been Done: 
-Entire basement has been dry walled and compounded. Third layer of compound drying as we speak.

-Flooring for the sewing studio has arrived! YAY!
-The bulkhead is in the process of getting wrapped and finished.
-Louvered door arrived for the storage room.

-Floor trim has been picked out.
-Final paint scheme and plan approved.
Laminate flooring!

Bulkhead wrapped with wood.
Louvered door and trims.





The next steps are fairly obvious. Sanding the compound, laying the laminate floor, finishing the tile, hang the drop ceiling, putting on trim, and installing the finishing electrical. Then I will have a freshly painted room with flooring and I have to put furniture in it. I'm planning on building a cutting table and ironing bench since I'm particular about those but I also have my eye on some peg board and accessories since they are so modular...or at least something similar. I can't wait to put my bookshelf in and set up my drafting table....very exciting!! Anyway I'll leave this as a short post for now! Good night all!